Environmental Impact Assessment Information Disclosure
1. Basic situation of construction projects
This project is a newly built project. The project construction site is located east of Jiutiaohe Road and south of the planned road in Shitang Phase III, Jiaojiang District. The total land area of this project is 32,176 square meters, and the construction area of new houses is 43,122 square meters. The project mainly purchases closed rubber mixing systems, vulcanizers, automatic inspection machines, and other equipment. After the project is completed, it will form an annual production capacity of 500 million pieces of high-precision automotive sealing rings and 1.2 million sets of EAS oil pump upper and lower sleeves. The total project investment is 135 million yuan, including 122 million yuan in fixed assets investment.
2. Distribution of major environmentally sensitive targets within the scope of environmental impact assessment
The main environmentally sensitive targets within the scope of the environmental impact assessment are the Taizhou Bay Recycling Industry Cluster Management Committee 850m to the east of the company's factory boundary, Yuehu Community 910m to the northeast, and Chenglong Village 1,800m to the west.
3. Forecast of major environmental impacts
The construction period mainly includes construction domestic sewage, flushing wastewater, construction dust, construction noise, construction slag and domestic garbage. The construction period is short and there will be no significant impact on the surrounding environment after reasonable measures are taken.
Wastewater during the operation period is mainly domestic sewage, cleaning wastewater, and other wastewater. After being treated by the sewage treatment facilities in the factory, it is discharged into the sewage pipe network and will not have a significant impact on the surrounding environment. The waste gas is mainly sulfurization waste gas, injection molding waste gas, etc., which are collected through adsorption, etc. Measures are taken to reduce exhaust gas emissions and will not have a significant impact on the surrounding environment; the noise is mainly the noise of mechanical equipment, and through measures such as sound insulation and shock absorption, the noise at the factory boundary is brought up to standard; the solid waste is mainly leftover materials, defective products, and filter rubber waste residue, packaging materials, domestic waste, etc., after being collected in categories and properly treated and disposed of, they will have basically no impact on the surrounding environment. Reasonable prevention and control measures will be taken to ensure that all pollutants are discharged up to standard. This project will have little impact on the surrounding environment.
4. Main environmental protection measures, environmental risk prevention measures, and expected effects to be taken
During the construction period, domestic sewage will be transported out, flushing wastewater will be reused, and measures such as dust reduction, noise reduction, solid waste backfilling, and timely removal will be taken to minimize the impact on the external environment during the construction period.
During the operation period, process wastewater such as cleaning wastewater and domestic sewage is discharged into the sewage pipe network after being treated by the wastewater treatment facilities in the factory to meet standards; vulcanization waste gas and injection molding waste gas are collected and treated at high altitudes through absorption, adsorption, etc.; low-noise equipment is selected to deal with high Noise equipment is used for sound insulation and noise reduction to reduce the impact of noise; solid waste is collected in strict accordance with relevant specifications and disposed of separately. Establish an emergency response system for environmental emergencies and prepare and implement emergency plans. Various pollution prevention and control measures taken in this project are economically reasonable and technically feasible and can ensure that pollutants are discharged up to standard.
5. Preliminary conclusions of environmental impact assessment
After being treated with corresponding measures, the impact of various pollutants generated by the project on the surrounding environment will be within the tolerable range, and the environmental risk will be within the acceptable level. This project basically complies with the environmental protection approval principles.
6. Contents of soliciting opinions
Scope and main matters of soliciting public opinions: Agencies, enterprises, institutions, and individuals in the area where this project is located can put forward opinions and suggestions on the rationality of site selection, pollution prevention, and control countermeasures or other project-related issues, and explain the reasons. If you need to know more about the environmental protection-related information of this project, you can go to Zhejiang Taicheng Environmental Technology Co., Ltd. to check the relevant content of the environmental impact assessment document during this announcement period.
Ways for public feedback: The public can submit opinions to the environmental assessment unit Zhejiang Taicheng Environmental Technology Co., Ltd., the construction unit Zhejiang Haiwei Technology Co., Ltd., or the local environmental protection administrative department by means of letters, phone calls, faxes, emails, etc.